A weekend crew is a group hired to work only Saturdays and Sundays so the weekday workforce keeps its weekends. It looks like the simplest way to go from five days to seven. In our experience it rarely lasts: either the crew is paid only for the hours it works and turns over constantly, or it is paid a full week for a short one and labor cost climbs. Designs that build weekend work into everyone’s regular schedule tend to hold up better, though there are cases where a weekend crew is what the workforce prefers.

What Is a Weekend Crew?

A weekend crew, sometimes called a weekend warrior crew, works only on weekends. The usual form is two 12-hour shifts, Saturday and Sunday, which makes a 24-hour work week. Some versions add Friday or Monday for 36 hours. The weekday crews work Monday to Friday and never see a weekend shift.

Why Do Companies Consider a Weekend Crew?

The appeal is easy to see. An operation that needs to grow from five days to seven can add a weekend crew without changing anything for the people it already has. Nobody on the weekday crews loses a weekend, no rotation has to be negotiated, and the plan is quick to draw up and bid out. It is often the first answer on the table.

Why Do Weekend Crews Usually Fail?

The trouble starts with pay. There are two ways to pay a crew that works a short week, and neither holds up well.

 Pay for hours workedPay full wages and benefits for the short week
What the crew earnsA part-time paycheckA full-time paycheck for part-time hours
What it costsLess in wages, more in turnover and trainingApproximately 25% more labor cost on a four-crew operation: five crews in place of four
What usually happensHigh turnover, low skill levels, little loyalty to the companyThe added cost is hard to sustain

The second problem builds more slowly. A weekend-only crew becomes a separate workforce. Its people are cut off from the weekday operation, with weaker training continuity, weaker supervision, weaker career progression and consistently higher turnover. These problems are not visible in the first six months. They accumulate over years, and by then the structure is hard to undo without disruption.

Is There Ever a Case for a Weekend Crew?

Sometimes. The test is what the alternative is and what the workforce thinks of it. In one distribution center, departments had been covering weekends by giving people five-day weeks with an unpredictable weekend day. Employees saw a dedicated weekend crew as a better deal than that, and the change improved retention and recruiting in the departments that carried weekend work. Read the case study.

What made it work there was that the option was tested with employees before anything was designed. A weekend crew chosen because it is the quickest plan to draw up is a different thing from one the workforce has compared with the alternatives and picked.

What Works Better Than a Weekend Crew?

Which Schedule Is Right for Your Operation?

A pattern or a rule of thumb is only the starting point. The right answer depends on your coverage needs, your workforce’s preferences, your overtime and absence rates, and the policies that go with the schedule — and most sites end up with a design tailored to them. That analysis is what a Shiftwork Solutions engagement does. Talk with us about your operation, or start with the free Shiftwork Assessment.

Related Reading

Frequently Asked Questions

A weekend crew, sometimes called a weekend warrior crew, is a group of employees hired to work only Saturdays and Sundays, usually on 12-hour shifts, so the weekday workforce keeps its weekends off.
Rarely for long, in our experience. Paying weekend workers only for the hours they work leads to high turnover and thin skills. Paying full wages and benefits for a short week raises labor cost sharply. Either way a weekend-only crew tends to become a separate workforce with weaker training, supervision and career progression.
It depends on how it is paid. If a weekend crew is added to a four-crew operation and paid full wages and benefits for its short week, overall labor cost rises by approximately 25%, because you are paying five crews in place of four. Paying only for hours worked costs less in wages and more in turnover and skill.
Build weekend coverage into the regular workforce's schedule. Common approaches are a rotation in which the same crews cover weekdays and weekends and everyone gets weekends off in turn, a volunteer weekend roster with a premium high enough to fill it, and checking first whether six days would meet the need without a seventh.